Full performance pipeline system

Professional integration service provider

1573110106211025.png

Free consultation hotline

400-1818-935

zggq.jpg




Aluminum alloy pipe
Your current location : Home >> News >> News Center

Application scope of aluminum alloy pipe clamp

2022-05-21
second

铝合金管道

   

It is installed on the ground guide rail, which can be welded on the foundation or fixed with screws. Then push the rail nut into the rail and rotate it 90 degrees. Insert the lower clamp body of the aluminum alloy pipe into the nut and place the pipe to be fixed. Then place the upper pipe clamp body and cover plate and fix them with screws. Folding assembly: the guide rail can be welded on the foundation or fixed with screws.

First install the lower pipe clamp body of aluminum alloy pipe, place the pipe to be fixed, then place the upper pipe clamp body and fix it with screws. Prevent it from rotating through the locking cover. Then install other pipe clamps in the same way. Elbow assembly: when assembling the elbow.

The front and rear of the bend shall be directly fixed with Castel pipe clamps. It is suggested that such support points should be fixed. Therefore, there is no difference between the pipe clamp and the pipe clamp. Their uses are the same, but the product names are different. Some people call him pipe clamp, others call him pipe clamp. Pipe clamp: the pipe clamp is fixed (commonly known as saddle clamp). It is used for ground fixation (note that the position of geothermal ground or ground channel cannot be fixed with gypsum line). Pipes before ground leveling shall also be fixed. Pipes shall also be fixed on the ground.

The installation methods of the aluminum alloy pipe clamp mainly include the following: the bottom plate of the pipe clamp is short and fixed by welding. Press the pipe clamp with slotted round head screws and washers. The pipe clamp base plate is short and fixed by welding. Press the pipe clamp with hexagon socket head screws and washers. The pipe clamp base plate is short and fixed by welding. Press the pipe clamp with the outer hexagon bolt and the cover plate. The base plate of the pipe clamp is fixed by welding or bolts. Press the pipe clamp with slotted cheese head screws and washers. The base plate of the pipe clamp is fixed by welding or bolts. Press the pipe clamp with hexagon socket head screws and washers.


Label

Hot key words

Copyright © Dalian Pipro Technology Co., Ltd. record number:辽ICP备18019462号-1
Specializing inAluminum alloy pipeline,super pipeline,Dalian compressed air pipeline,Welcome to inquire!
Sitemap | RSS | XML

派普路微信公众号.jpg

Support hotline:

400-1818-935

Service hotline : 400-1818-935

E-mail:piproline@163.com

Address:Lantian Industrial Park, Ganjingzi District, Dalian

Copyright © 2018-2019 Dalian Pipro Technology Co., Ltd. All rights reserved